Interim report on post project evaluation of SSIO Project Completed (ระเบียนเลขที่ 2609)

000 -LEADER
fixed length control field nam a22 4500
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number RID.631.7
Item number S3i
-- 1982
245 ## - TITLE STATEMENT
Title Interim report on post project evaluation of SSIO Project Completed
Remainder of title by the End of Fy 1980
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bangkok
Name of publisher, distributor, etc. Royal Irrigation Department
Date of publication, distribution, etc. 1982
710 ## - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element SSIP Projects Completed
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type หนังสือกรมชลประทาน (ภาษาอังกฤษ)
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Permanent Location Current Location Shelving location Date acquired Full call number Barcode Date last seen Price effective from Koha item type
          หมวด 600 เทคโนโลยี (วิทยาศาสตร์ประยุกต์) ห้องสมุดกรมชลประทาน ห้องสมุดกรมชลประทาน ห้องสมุดกรมฯ ชั้น 2 : ชั้นหนังสือของกรมชลประทาน ภาษาอังกฤษ (RID.) 2017-11-30 RID. 631.7 S3i 1982 RID0000004314 2019-11-27 2017-11-30 หนังสือกรมชลประทาน (ภาษาอังกฤษ)
ห้องสมุดกรมชลประทาน
811 ถนนสามเสน แขวงนครไชยศรี เขตดุสิต กรุงเทพฯ 10300
โทรศัพท์: 0-2243-1043 โทรสาร: 0-2669-5056 อีเมล: [email protected]