000 | nam a22 4500 | ||
---|---|---|---|
999 |
_c11082 _d11082 |
||
005 | 20191010162432.0 | ||
008 | 181012b ||||| |||| 00| 0 tha d | ||
040 |
_aRID _btha _cRID |
||
082 |
_aRID. 627.52 _bT3n 1984 |
||
110 | _aTahal Consulting Engineerrs Ltd. | ||
245 | _aNam Pong Irrigation Project Stage II : Summarizing report on flood control hydrology and dykes their operation and maintenance. | ||
260 |
_aBangkok _bRoyal Irrigation Department _c1984 |
||
300 |
_a1 เล่ม _bภาพประกอบ , ตาราง _g21x29 ซม. |
||
942 |
_c12 _2ddc |
||
998 | _cภิรมณ์ญา |