000 nam a22 4500
999 _c13142
_d13142
005 20191010162600.0
008 190906b ||||| |||| 00| 0 tha d
040 _aRID
_btha
_cRID
082 _aRID. 627.81
_bA7w 1983
100 _aRoyal Irrigation Department
245 _aWater for the Northeast : Assessment and Rehabilitation of Tank Irrigation Project : Volume II - Main Report : Nong Sam Rong, (หนองสำโรง, อุดรธานี).
260 _aBangkok
_bAsian Institute of Technology
_c1983
942 _c12
_2ddc