000 | nam a22 4500 | ||
---|---|---|---|
999 |
_c7182 _d7182 |
||
003 | RID | ||
005 | 20240719151430.0 | ||
008 | 240719b ||||| |||| 00| 0 tha d | ||
040 |
_aRID _btha _cRID |
||
082 |
_aThe. 631.7 _bS8r 1981 |
||
100 | _aSuchat Nawagawong. | ||
245 | _aReappraisal of the conventional benefit-cost analysis methodology generally used for multipurpose dam construction project with particular reference to benefit derived from irrigation ------------------A case study of lang suan multipurpose project, southern thailand. | ||
260 |
_aBangkok _bMahidol University _c1981 |
||
942 |
_c82 _2ddc |